Consulting
Verticals
Co-operative BankingSEBI and FintechMSM ManufacturingEducation
Technology Stacks
How the chain worksNetwork and infrastructure architectureData traffic engineeringInformation-security data engineeringCybersecurity control architectureGovernanceIndustrial edge and IoT gatewaysIndustrial IoT and asset lifecycle
Compliance
DPDP ActRBI CSFSEBI CSCRFNIST CSF 2.0
Case Studies
For Partners
Insights
ArticlesBulletinTalks and Events
About
The LabFounderRecognitionProfessional projects

Case studies / A government industrial estate

MSM MANUFACTURING

A government industrial estate

An edge programme for the estate's micro, small and medium units: one method across seven industrial disciplines, from the shop floor to the top floor.

SECTOR
Government industrial estate, Vidarbha
ENGAGEMENT
Industrial edge programme for the estate's units, 2026
NILWIRE'S ROLE
Programme design

THE SITUATION

A practical route, sized for a small plant.

The estate's manufacturing units asked for a practical route from the shop floor to the top floor, sized for a small plant and its budget.

What we did

Seven disciplines, one method.

A1

Industrial edge

Machine signals translated into usable data at the machine.

A2

Industrial IoT

Sensors, meters and a platform for machines with no ports.

A3

Industrial networking

Segmented, zoned and redundant plant networks built for dust, heat and distance.

A4

Industrial data centre

Protected room, power, cooling and tested recovery.

A5

Cybersecurity and compliance

NIST CSF 2.0 translated into six questions an owner can answer.

A6

Managed operations

Service against agreed levels with a monthly report.

A7

Connected Plant programme

OT/IT convergence in five stages, proved on one line first.

Machine connections are read-only by design, and plant networks follow IEC 62443 zones and conduits.

BUILT AROUND REAL NEEDS

Twelve cases the programme answers.

  • One network across a large, multi-bay site, with each fault kept in one bay.
  • A protected home for the ERP, shown by a real restore.
  • Drawings and designs protected, with the shop floor working from the released revision.
  • A traceable process record for every casting batch.
  • Machine hours flowing into job costing.
  • Assembly starting with a complete kit.
  • Each serial number leading to its record.
  • An ERP for engineered-to-order machinery.
  • Purchasing and job-work in one tracked flow.
  • Service history for every machine in the field.
  • Answers ready for lenders, export customers and the DPDP Act.
  • Morning numbers on a dashboard.

Where it stands

Units can start small.

A unit can begin with a plant assessment, a security and backup check, a DPDP readiness review, a read-only pilot on three to five machines, or a plant data readiness study. The first year runs through assess, quick wins, build, integrate and run.

RELATED

Continue reading.

Vertical

MSM manufacturing

Machines connected as they stand, through one controlled path into IT.

Case studies

All case studies

Two named flagships and more engagements described by sector, region and scale.

Consulting · first engagements

See how a first engagement works.

Start small, prove it, then scale. Six small engagements, each with a plain question and a written plan.

Book an assessment