Consulting
Verticals
Co-operative BankingSEBI and FintechMSM ManufacturingEducation
Technology Stacks
How the chain worksNetwork and infrastructure architectureData traffic engineeringInformation-security data engineeringCybersecurity control architectureGovernanceIndustrial edge and IoT gatewaysIndustrial IoT and asset lifecycle
Compliance
DPDP ActRBI CSFSEBI CSCRFNIST CSF 2.0
Case Studies
For Partners
Insights
ArticlesBulletinTalks and Events
About
The LabFounderRecognitionProfessional projects

VERTICALS

Co-operative banking: networks and controls that stand up to the RBI and ReBIT.

Urban co-operative banks answer to the same regulator as large banks, with far smaller teams. We bring the architecture, the controls and the evidence an examination asks for, sized for a co-operative bank and explained in language its board can use.

THE RULEBOOKS

The frameworks this sector answers to.

Each engagement starts from the rulebook that applies to the client. We map each requirement to the stack that fulfils it, and keep the evidence.

RBI Directions 2026

Issued 31 July 2026 for urban co-operative banks. Four levels, set by digital depth and payment-system links, decide the chapters: Level I covers Chapters II and III, and Level IV covers Chapters II to VI, including a Cyber Security Operations Centre for continuous surveillance (¶ 159). Every level carries Board-approved policies (¶ 7), a periodic IT architecture review (¶ 13), offline backups (¶ 69) and vendor risk oversight (¶ 71).

RBI Directions 2026: the technical baseline

Network devices are configured, assessed periodically and kept securely maintained (¶ 33), and critical infrastructure is designed with network segregation (¶ 36). Boundary defences are multi-layered, with firewalls, proxies, a DMZ, IPS and IDS, and inbound and outbound filtering (¶ 106). LAN segments for in-house ATM and for core banking and branch networks stay separate (¶ 107). Firewall rules block unidentified outbound connections and reverse TCP shells (¶ 135), and audit logs are retained as business, regulatory and legal needs require (¶ 128), carrying timestamps and source and destination addresses (¶ 151).

DPDP Act 2023 and DPDP Rules 2025

Safeguards engineered for members' and customers' personal data: encryption, masking or tokens, access control, monitoring and review, backups for continued processing, and logs kept for one year (s. 8(5), R. 6, reasonable security safeguards). A breach is notified to each person affected without delay, and to the Data Protection Board within seventy-two hours (s. 8(6), R. 7, breach intimation). Data is erased once its purpose is served (s. 8(7), R. 8, erasure). The duties are phased to May 2027.

CERT-In Directions 2022 and RBI incident reporting

A UCB reports a cyber incident on the RBI's DAKSH platform within six hours of detection (¶ 88) and notifies CERT-In (¶ 87). The CERT-In Directions 2022 add system logs kept for 180 days within India and clocks synchronised to the NIC or NPL time servers, so the network design carries time synchronisation, log collection and retention from the first day.

PCI DSS v4.0.1

This applies where a bank issues cards or runs its own ATM switch, and the Directions require ATM switch service providers to comply with PCI DSS and PCI SSF (¶ 85(37)). The network contribution is a defined card data environment: segmentation that limits PCI scope (Requirement 1), secure configuration of every device (2), strong cryptography for card data in transit (4), log collection and review (10) and segmentation testing (11). A Qualified Security Assessor carries out the formal assessment.

NIST CSF 2.0

Six functions (Govern, Identify, Protect, Detect, Respond, Recover) hold 22 categories and 106 outcomes, and the network outcomes sit across five of them. Identify asks for maintained maps of authorised network communication and data flows (ID.AM-03). Protect asks for networks protected from unauthorised logical access (PR.IR-01), data at rest and in transit protected (PR.DS-01, PR.DS-02) and log records generated for monitoring (PR.PS-04). Detect asks for networks and network services monitored for adverse events (DE.CM-01). Recover asks for backups created, protected and tested (PR.DS-11) and their integrity verified before restoration (RC.RP-03). A Current Profile and a Target Profile measure the gap, and Tiers 1 to 4, from Partial to Adaptive, rate how well each outcome is managed.

TRAINING AND WRITING

Carrying the same message to the boardroom.

Training for bank officials

More than ninety officials from twenty-two co-operative banks trained on RBI compliance and cybersecurity controls.

Column in Nagari Bank Vartapatra

April to June 2026: the RBI Cyber Security Framework and the DPDP Act 2023, with seven remedies and thirteen questions for the CISO, CTO and CIO.

Talks

UCB Top 100 CXO Summit, January 2026, and the National Cooperative Banks Carnival, November 2026.

Talks and events →

WHERE TO START

Small first engagements that give a real answer.

Regulatory gap analysis

Your environment measured against the RBI 2026 Directions and the DPDP Act, with a roadmap and owners.

DPDP readiness review

Readiness for the DPDP Act 2023 and Rules 2025, phased through 2027, with evidence an auditor can accept.

Network assessment

A survey, a node inventory and a traffic study of branches and data centre, with the highest-risk findings first.

Board and staff awareness

Training for directors, management and staff, recorded as an RBI control.

Case studies

Work in co-operative banking.

All case studies →

Case study

A Level I and II urban co-operative bank

Network architecture and more than one hundred cybersecurity controls, approved in a joint on-premise audit by the RBI and ReBIT.

Amravati · 2023 onward

Read the case study →

Scheduled urban co-operative bank

A two-year RBI compliance journey

A gap analysis against the RBI framework and a roadmap of twenty-seven activities, each with a responsibility matrix, carried through to a completed Self-Assessment Questionnaire.

North Maharashtra · 2022 to 2023

Read the case study →

Multi-state credit society

Assessment and a two-phase roadmap

An assessment of network, hosting and core banking, followed by a roadmap that stabilises first and strengthens second.

Consulting · first engagement

Start with the regulatory gap analysis.

Start small, prove it, then scale. A short written plan, with owners and dates, comes first.

Book an assessment